Thursday, September 20, 2012

Build Day 7

Build Day 7, September 20, 2012

Lots, and lots, (and LOTS) of little stuff today.  Today was all about all of those little things that take so much time to complete!  Installing cabinets, door casings, base-board molding, closet shelves, finish painting, and one last touch-up of the exterior paint.

The electrician was also in today, installing outlets, switches, and lights.

All of this work takes much longer than you would think.  Unlike the framing -- that is covered up -- all of this trim work is what people will see, so it has to look good and be right.

 Carla touching up paint on the front of the house.

 Our electrician!

Installing door casing.

Painting one of the bedrooms.  Two of the bedrooms got accent walls!

Installing cabinets.  This took all day! (and they still are not done).

The outside of our house at the end of the day.

Tomorrow is everything that we didn't complete today. The plumbers come in tomorrow to install all of the finish plumbing.  We will finish touching up the paint on the inside, installing things like door knobs, towel bars, and closet rods.  The carpet layers should come in the morning.  Also the sod is being delivered in the morning -- looks like we get to do some landscaping!  

People of Walmart?  Nope.  We ran into Hope and Cody after finishing for the day, in Walmart of all places.  They helped out again today on our build!  Thanks for coming out!  We hope to see you on one of our future builds.